WALLS
BAG BLOCK WALLS– Walls to be Bag Finished (as located by plans)
INSULATION– Prepare wall by filling in joints and finish render flat. Use a proprietary brand such (as located by plans)
BLOCK WALLS– Rendered
EXTERIOR EXPOSED– Should all be hot dip galvanized BUT if time does not permit then immediately coast all.
STEEL WORKS– Steel or all manufactured areas with metal primer and cold gal. Paint finish as specified. Cold gal to all new drilled or worked areas.
INSULATION– Wall partitions Acousti-therm R2.5 batts